南華大學機構典藏系統:Item 987654321/29566
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 18278/19583 (93%)
Visitors : 1035122      Online Users : 406
RC Version 7.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version
    Please use this identifier to cite or link to this item: http://nhuir.nhu.edu.tw/handle/987654321/29566


    Title: On the leadtime effect of two-stages production planning with random point demand
    Authors: 陳淼勝;Chen, Miao-Sheng
    Contributors: 企業管理學系
    Date: 1999
    Issue Date: 2023-08-03 14:20:29 (UTC+8)
    Abstract: Chen & Chen [4] constructed the production planning model that was based on three assumptions: (1) the demand occurs in the future time and is a random variable, (2) there are two stages in the production process, (3) the unit production cost is a linear function of production in the unit time. Then, the optimal production rates is derived so as to maximize the profit.The aim of this article is to extend the model under (1) the leadtime between the production process is considered, (2) the object is cost minimization. And then, the phenomenon of optimal solution is discussed.
    Relation: Journal of Statistics and Management Systems
    vol. 2, no. 1
    pp.23-40
    Appears in Collections:[Department of Business Administration, Master/Ph.D Program in Management Sciences] Periodical Articles

    Files in This Item:

    File Description SizeFormat
    index.html0KbHTML97View/Open


    All items in NHUIR are protected by copyright, with all rights reserved.


    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - Feedback